Many municipalities face the problems of declining roadway infrastructure and limited funds to pay for repairs. Adhering to a set road maintenance plan can help your municipality save time, money, and dramatically extend the life of your roads. Keep reading to learn how the Village of Hartland found success by adopting a new pavement management model.
The Village of Hartland’s Arlene Drive sanitary lift station serves a high-end residential community adjacent to a golf course. Many of the homes served by this submersible lift station use a cleaning service. Unfortunately, “disposable” wipes and other cleaning materials that are frequently used by these cleaning services are often flushed down the toilet, clogging the lift station pumps. Before this issue was resolved, the Village utility staff were sent out several times a week to pull the pumps from the wet well and unclog them.
The City of Franklin had one subdivision that was experiencing unusually high peak to average sewer flows. A hundred homes were 1950’s vintage, the subdivision was rural cross section with ditches, and there were known homes with hung plumbing and possible cross connections. Learn how utility rehabilitation assisted in resolving this issue.
The Village of Mukwonago recently committed to building a new 115-acre business park in its thriving community. The key to the development of the business park was a clear understanding of its community-wide infrastructure systems and how that expanded infrastructure would fit within the community’s infrastructure puzzle.
Ruekert & Mielke, Inc. (R/M) provided the City of Sheboygan with electrical engineering services to layout and design an LED lighting system to serve their new SouthPointe Enterprise Campus. By going with an LED-based lighting system, the City will benefit through reduced energy consumption, lower maintenance, and longer-lasting fixtures.
Water pumped from the deep sandstone aquifer in Southeastern Wisconsin usually contains radium. This radionuclide occurs naturally. People drinking water containing a high concentration of radium are at increased risk of developing bone cancer.
Learn how R/M worked with the Village of Pewaukee to design an economical treatment system to remove radium from their groundwater.
Many municipalities face the problems of declining roadway infrastructure and limited funds to pay for repairs. Undertaking proper pavement maintenance at the appropriate time produces overall savings to the community. With limited funding for its road repair program, the City of Pewaukee used an innovative approach to resolve their roadway problems.
Just about every project has some sort of challenge. There are physical challenges such as, wetlands, endangered resources, environmental corridors, storm water planning, setbacks, topography, proximity to services (or lack thereof), and access. Then, there are financial challenges like supply and demand, changes in the economy, and over-extension. What makes this private development a great case study is that all these challenges were experienced.
As the City of Kenosha embarked on a comprehensive analysis of their storm water infrastructure from both flood control and water quality perspectives, the City was hit with back-to-back intense rainfall events in July of 2017 that resulted in significant local and regional flooding. The immediate public health and safety concerns tied to this flooding event doubled down the City’s efforts to simultaneously develop a long-term plan for the future, while also quickly addressing some of the most pressing concerns.
The Village of Menomonee Falls is the perfect example of how long-range planning can increase your SCADA system's reliability. Over the past 25 years, their ongoing system maintenance and regularly scheduled hardware and software upgrades have resulted in no significant failures. Read more to learn how they did it.
The City of Peshtigo has experienced recent sewer system overflow events that have been partly due to high wet weather flows. R/M assisted in performing a smoke testing program as part of the City’s sewer system evaluation survey (SSES).
Earlier in 2017, R/M designed a water main replacement project for the City of St. Charles, IL, utilizing the horizontal directional drilling (HDD) installation method. Incorporating the HDD method of installation saved the City nearly 25% over an open-cut and auger alternate method of construction.
Development drove the need for the City of Oconomowoc to provide new municipal facilities. Impact fees helped them meet the need by providing facilities, such as Fire Station No. 2, to fuel development.
Learn how Oconomowoc was able to fund facilities to attract development through working with R/M on an impact fee study.
The City of New Berlin was faced with a difficult design challenge for a 7-block section of alley in the Buena Park neighborhood. The City wanted to take advantage of a Green Solutions grant from the Milwaukee Metropolitan Sewerage District (MMSD). The solution was a porous asphalt pavement to provide storm water storage, filtration, and conveyance.
In the summer of 2016, the Village of Brown Deer contacted Ruekert & Mielke, Inc. (R/M) for assistance in developing an urban forestry project that would be strong enough to meet the application needs of the DNR's Urban Forestry Grant.
The City of Pewaukee Water & Sewer Utility has been proactive recently in upgrading several components of their Supervisory Control and Data Acquisition (SCADA) System. By anticipating needs in advance, several smaller projects were able to be budgeted for and sequenced out over a several year period.
The School District of South Milwaukee hired Ruekert & Mielke, Inc. (R/M) to review an ongoing drainage problem on their high school football field. The field became saturated when it rained and wet conditions made it difficult to maintain the natural grass causing field activities to be delayed or moved elsewhere. Learn how R/M helped them get back on the field.
The Village of Fox Point obtained an Urban Nonpoint Source Planning Grant from the Wisconsin DNR to update the Village's storm water management plan, emphasizing water quality modeling, updating ordinances, and evaluating Milwaukee River TMDL requirements. The Village selected Ruekert & Mielke, Inc. (R/M) in part due to their comprehensive storm water experience and capabilities in order to fully utilize the grant funding.
Keeping up to date with municipal road ratings and pavement management requires both organization and experience. The Town of Waukesha has utilized the services of Ruekert & Mielke, Inc. (R/M) for their pavement management needs, recognizing R/M's tested approach to providing quality pavement management programs to communities in Wisconsin and Illinois.