New Berlin School District
New Berlin Eisenhower High School - Surface Improvements
More than 97% of the 10-plus acres of pavement needed improvements at Eisenhower High School. Over a five-year plan, R/M developed a pavement cross-section to stabilize the subgrade and optimize pavement performance while minimizing cost. R/M also developed an effective drainage plan with minimal asphalt slopes and storm sewers. Additionally, the team improved pedestrian safety and traffic flow.
Additional Projects:
Orchard Lane Elementary - Surface Improvements
Poplar Creek Elementary - Pavement Improvements
School District of Waukesha
Waukesha Hillcrest Elementary School - Playground Replacement & Construction Services
During the playground reconstruction, R/M suggested the use of Portland Cement as a cost-friendly alternative to asphalt to reduce the loading on the school’s air conditioning use. This was recommended because asphalt absorbs heat and reflects it along the building. R/M was also able to resolve the school’s surface drainage challenges by designing a dry pond west of the playground to manage the school’s storm water.
Additional Projects:
Rose Glen Elementary - Pavement Rehabilitation & Construction Services
Blair Elementary - Parking Study & Construction Services
Whittier Elementary - Traffic Parking Capacity Review
Banting Horning Schools - Pavement Rehabilitation & Construction Services
Mukwonago Area School District
Mukwonago Rolling Hills Elementary School - Pavement Rehabilitation
Rehabilitation of the entire campus was warranted due to the condition of the pavement. R/M developed construction documents that provided the opportunity for the district to phase the construction over multiple years, as their budget allowed. Due to competitive bidding, the district was able to complete the entire rehabilitation project in one year. Throughout construction, R/M’s Construction Management Team helped identify opportunities to reduce the cost to the district and expedited the completion of this project.
Additional Projects:
Prairie View Elementary - Lot Addition
Clarendon Avenue Elementary - Pavement Rehabilitation
Green Bay Area Public Schools
Design and Construction Administration 2020-2023
R/M was contracted to provide construction administration and review for Green Bay Area Public School District schools as pavement improvements were performed. These projects included the repaving and additions of small parking lots, storm sewer work, and underdrain work. R/M assisted with the coordination of the installation of playground equipment, basketball hoops, and fencing across the school grounds.
During the course of one of the projects, it was found that some subgrade and sub-surface water drain issues had not been identified during the design process. R/M worked to mitigate those issues to ensure the long-term success of the pavement improvement. Our team coordinated schedules, payments, and communications with schools and staff regarding construction.
Additional Projects:
N.E.W. School of Innovation - Parking Lot & Pavement Design
John Dewey Academy of Learning - Parking Lot & Pavement Design
Leonardo Da Vinci School for Gifted Learners - Parking Lot & Pavement Design
Edison Middle School - Parking Lot & Pavement Design
West High School - Parking Lot & Pavement Design
Southwest High School - Parking Lot & Pavement Design, Survey & Track Design
Eisenhower Elementary School - Parking Lot & Pavement Design
Lombardi Middle School - Construction Management, Survey & Track Design
East High School - Construction Management
Franklin Middle School - Construction Management
Lincoln Elementary School - Construction Management
Waterford school district
Woodfield Elementary School -
Maximize Parking Capacity
R/M provided a comprehensive design to encourage the use of less pavement following the school’s playground replacement and parking study. This resulted in the school redesigning its traffic pattern allowing a smoother and safer pick up and drop off.
Additional Projects:
Woodfield Elementary School - Playground Replacement and Maximized Parking Capacity
Trailside Elementary School - Playground Replacement and Maximized Parking Capacity
Racine Unified School District
Gifford Elementary School - Parking Lot Expansion, Playground Drainage
R/M provided a comprehensive design for 250 parking stalls as well as lighting for the school. By coordinating with the school district and the Racine Highway Department, the design incorporated the appropriate lighting, pedestrian crossing, rapid flashing beacon assembly, and main entrance accommodations that the school required. This expansion required R/M to work on an expedited timeline. All survey, design, and submittals were completed within a month in order to be prepared for the anticipated construction date necessary for the school.
Additional Projects:
Giese Elementary School - Survey, Traffic Study
Washington Island School District
Washington Island School District -
Site Civil Design Services
The Washington Island Schools were experiencing regular water infiltration on the north and east sides of the building. To design a cost-effective solution, R/M used drone technology to complete a topographic survey of the site to better understand the cause of the issues. After coming to a consensus, R/M prepared a plan set for the district with removal plans, erosion control plans, site plans, utility plans, and grading plans which will all be used during construction.